The richest man starts from a street stall

Chapter 398 Inspecting the Construction Site

Chapter 398 Inspecting the Construction Site
Two 10 minutes later.

A large Mercedes-Benz G63 SUV and a BMW 740 sedan arrived at the construction site of the high-end mall of Shenshi Group.

When the boss of Shenshi Group arrived, the person in charge of the scene did not know in advance.

But not long after Chen Shi and the others stepped into the construction site, many people recognized him because he was so handsome and recognizable.

It didn't take long before the entire construction site management staff knew about Chen Shi's arrival.

This seemed to be a surprise attack, and it made a depressing tension hang over the construction site.

The construction migrant workers didn't care what Chen Shilai did, but were more curious about this young rich man who often made headlines, and treated him like a monkey;

Those who are nervous are the person in charge of the construction company and the third-party supervisor (a third-party company for construction quality inspection of construction projects).

There are more than a dozen construction companies on the construction side, divided into dozens of large and small projects. Each project has a leader, that is, the project leader.

There are several third-party supervision companies. Shenshi Company entrusts them with the responsibility of supervising quality and progress. There are hundreds of people, that is, there are several supervisors for a project.

The companies of the two parties took the money from the Shenshi Group, and the one who gave the money was the uncle.

The Shenshi Group also has personnel on site, but there are only a dozen of them, all of whom are experts in the construction of the Shenshi Group, and some experts and professors in the construction field came to investigate.

This complex of high-end shopping malls and high-end residences in Rongcheng has a total planned investment of 275 billion yuan. At present, Shenshi Group has invested 130 billion yuan, of which land accounts for 60 billion yuan.

The project is large, and the profit margins are also large. There are too many construction companies bidding for this project.

On this [-]-acre construction site, the current construction situation is vigorous.

It is the end of July, and it is the hot season in Chengdu.

It was only ten o'clock in the morning, there was no wind at all, it was a bit sultry, and the thick air seemed to be frozen.

The reinforced concrete blocks on the construction site were so hot in the sun that when someone stood on them, it felt like the soles of their shoes were melting.

Countless heavy-duty trucks shuttle back and forth on the construction site, their wheels billowing with smoke and dust.

There are countless workers wearing yellow hats, occasionally technicians wearing blue hats, supervisors wearing white safety hats, and many wearing red hats, most of whom are managers.

Each hat color represents a different identity.Of course, there are also mixed wear.

Chen Shi changed into a POLO short-sleeved shirt when he went out today. Not long after arriving at the construction site, he started to sweat on his back.

Xiao Zhuang, who was following him, asked Chen Shi if he wanted to put on sunscreen when he came out. At that time, Chen Shi was embarrassed to use women's things, so he shook his head and refused.

But now if I really want to investigate outside for a day, I will really expose people, I really regret it.

Hey, a face-saving man.

At this time, Xiaozhuang's white shirt was soaked with sweat, and the indescribable suspenders could be vaguely seen inside.

Zhang Qian was not much better, her forehead was sweating all the time, and she drank half a bottle of mineral water in her hand.

You can also blow the air conditioner in the car. Outside the construction site, not long after leaving the car, it was so hot and sweaty, but seeing that the boss Chen Shi didn't say anything, the two ladies had no choice but to follow.

The temperature is higher in the area near the steel structure exposed to the sun, and those workers are used to the construction site environment.

Chen Shi was wearing a white safety helmet, and four bodyguards also wearing white safety helmets were in charge of the security situation around him. Zhang Qian was accompanying him to explain, Xiaozhuang was recording the situation, and they were watching and chatting.

Not long after, dozens of people in charge of the construction party came over, and Zhang Qian also called several experts from his own party to accompany him.

Dozens of people surrounded Chen Shi, and when Chen Shi asked anything, someone would always introduce him.

The first place to observe is the construction site of Shenshi Yujing Villa, with a residential building land of 32 mu, [-] floors of large flat high-rises + single-family villas.

The progress here is relatively fast, more than half of the high-level main body has been completed. The progress of the ordinary first floor is about seven days, and the top floor is estimated to be about ten days. It is estimated that the main body will be completed in two or three months.

For the villa, the progress is the fastest, and the main body has been completed.

"I remember that the apartment types here are mainly duplexes, right?" Chen Shi asked casually, but he knew it well.

“是的,董事长,高层户型以215平、280平、365平,250平到400平的跃层为主,少数量的600-800平大平层和跃层。”一个50多数的专家给陈石解释。

Chen Shi asked again: "Oh, one apartment per staircase?"

"The large flat floor is our unique two-elevator one household, which goes directly to the door; other apartment types have two elevators and two households, and three elevators and four households."

Chen Shi nodded, and asked while walking.

For the residential part, since the design is to separate people and vehicles, the underground two-storey garage should be constructed.

The separation of people and vehicles is to completely separate the flow of people and vehicles on the road, and go their own way without interfering with each other.

In residential areas, more precisely, motor vehicles and electric vehicles are not allowed to pass or park on the ground, except for fire trucks, or moving furniture for renovation.

Generally, bicycles are allowed to pass, but they are also not allowed to be parked on the ground. They are parked in the basement.

In this way, the impact of vehicles on the activities of residents on the ground can be reduced, the living comfort can be increased, and accidents caused by vehicles hitting people can be avoided, so that children can rest assured that children can play in the community.

Old residences in the past few years were rarely designed to separate people and vehicles. After all, the cost of building a basement was too high, and it was not worthwhile to sell parking spaces.

On the other side of the shopping mall, there is a four-story underground garage, which of course also separates people and vehicles.

Of the 15 acres of commercial land, the single-story underground parking lot has an area of ​​[-] square meters. It can be said that it accounts for almost half of the area. It is really an exaggeration.

The four-story parking garage has a total area of ​​60 square meters and can park [-] cars. It can be said to be the largest commercial indoor parking garage in China.

The design area is so large and the cost is so large that it is difficult for colleagues to understand.

Normally there is a one-story parking garage. With such a large area in the commercial area, it is designed to accommodate [-] parking spaces.

With [-] parking spaces, it can accommodate more than tens of thousands of people at the same time.

There are also parking spaces for bicycles and motorcycles in some places on the first floor of the commercial area, and vehicles, including bicycles, cannot be parked on the ground.

In most shopping malls, vehicles can be parked on the ground, and bicycles are not a problem, but it is not possible in Shenshi Mall, which is really incredible.

This design is not wrong, on the contrary, it is better. The floor is clean and tidy, it looks high-end, and the space is larger.

The importance of the shopping mall will become apparent when there is a large flow of people. Some citizens do not want to take a detour into the shopping mall when they see so many cars blocking the ground.

The bad thing is that the cost increases, which is not very convenient for cyclists.

The unique shopping mall in the country has a leading design concept. Of course, the degree of difficulty in construction has increased, and it has cost a lot of money.

When Chen Shi invested in this shopping mall, he asked for the parking problem of tens of thousands of people at the same time.

Now that everyone has money, there are more and more cars, and parking spaces are getting scarcer.

If even parking is so difficult, who will visit.

Let the citizens think that the high-end mall of Shenshi Group will never lack parking spaces, so just go there, and the parking fee will be free within two hours.

As long as you can attract people, there will be no shortage of popularity. If you have popularity, your sales will naturally increase.

The most annoying thing is that it takes a long time to find a parking space and there is no way to park. Even if things are cheap in shopping malls, young people are too lazy to go there.

If you can afford a car, you are afraid of trouble. It doesn’t matter if you spend more money. With the time saved, you can play two more games, isn’t it good, or do other things more.

He probably looked at the progress of the residential construction from the outside, and it was really unsafe to walk into the construction site, so Chen Shi walked towards the commercial construction site.

The two skyscrapers are the focus of the overall project, and the project period is also the longest.

At this time, some citizens have come to observe the construction of these two skyscrapers.

The perimeter is blocked by a fence, and passers-by cannot clearly see the ground construction inside the fence.

The sales department is not far away, and it has already opened for work at this time, entertaining the visiting citizens.

Chen Shi was recognized by many citizens, and more people gathered around, secretly taking pictures.

Chen Shi led a group of people to patrol until 11:30.

Overall, quite satisfied.

When I was about to leave, I made the following suggestions:
"The weather has been very hot in the past two months, we must pay attention to heatstroke prevention, and do not cause safety problems.

I hope you will treat the construction workers more preferentially. I don't want my project here to become a blood-sucking project. If something goes wrong, I don't want to cooperate with you for the next project. "Chen Shi directly wiped the sweat off his face with his hands, and looked worriedly at the workers on the construction site facing the scorching sun.

"Mr. Chen, don't worry. If it's hot weather, workers working in the open air from [-] noon to [-] p.m. will have to stop work. We are also afraid of safety accidents."

"Yes, Mr. Chen, Mr. Li is right."

"Mr. Chen is really a kind-hearted person. He treats his employees very well. Shenshi Group's benefits are top-notch in the industry. It is worth learning from us. We can't be ignorant people."

These project leaders often deal with Party A, and they are quite skillful and pure in the use of flattering skills.

During this period of time, those who are rushing to work at noon, it seems that they have to pay attention to the work of heatstroke prevention, and there must be no safety accidents.

Anyway, the Shenshi Group paid a lot of money and asked to meet the construction deadline, so they could work in two shifts a day and still be able to construct at night.

Satisfying customers is the mission of the project leader.

"Okay, I'll come back to see it when I have time. I hope you will continue to work hard and check the quality."

Chen Shi raised his voice. He said he would come over when he was free, and he probably wouldn't come again in two or three months. The ghost would want to come, it's too hot.

But he mentioned it, and a big stone was hung on the construction side and the supervisor.

During Chen Shi's inspection just now, he asked a lot of professional questions, such as the strength testing of concrete, the calculation of foundation settlement, the torsion calculation of high-rise wind tunnels, and the calculation of structural static force and seismic bearing capacity.

He is obviously an expert in architecture, so he is not easy to fool, let alone dare not fool him.

Seeing Chen Shi leave, these people waved happily and breathed a sigh of relief at the same time.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like