The strongest environmental protection technology

Chapter 41 The Real Infrastructure Maniac

Chapter 41 The Real Infrastructure Maniac

In the afternoon, this relatively flat land of weeds and shrubs will be cleaned up, and then construction will be carried out according to the design and construction drawings.

The large area of ​​flat land in the demarcated area is very large, and weeds and bushes are overgrown. Zhao Cangqiong thought that generally he can only use bulldozers to push it directly, or use an excavator in places with too many bushes.

Unexpectedly, new equipment was installed in the afternoon. This time, the equipment is a bit like a harvester in agricultural machinery. The front is a cylindrical steel grille, and a row of cutter wheels and a row of long rakes are arranged in a staggered manner. , followed by an upside-down trailer, and a conveyor belt protruding from the back of the middle bridge.

Next, a row of dozens of such engineering equipment trucks started to move forward at the same time. The speed was very fast, but the operation lines were arranged very neatly, as if they were pulling strings and advancing side by side.

Each equipment truck is followed by 10 clearing trucks in a straight line behind each equipment truck, and everyone keeps moving forward at the same speed.

Where the frontmost engineering equipment vehicle passed, weeds and shrubs were all cut off and crushed, and fell into the rear clearing vehicle through the transmission pipe.

While cutting off the plants on the ground, the nail rake has loosened the shallow ground, and the trailer behind the equipment truck will pull the shallow soil and rocks of about 60 cm on the ground into the trailer, and then fall into the rear clearing truck through the conveyor belt. .

The whole process is very fast. When the first clearing vehicle is about to be fully loaded, it will gradually leave the position for transfer, and at the same time the second clearing vehicle will immediately fill up the space. The whole connection is very close, and no clearing is spilled ground.

After checking the time, it has advanced 10 kilometers in 2 minutes, and these equipment vehicles will never touch anything other than the non-working surface in the irregular area of ​​the mountain, and the speed will not decrease throughout the process.

Looking down from above, there are long dragons galloping forward on the ground, and dozens of long dragons gather together to form a huge torrent of steel. All obstacles are flattened, and the deep texture under the surface of the earth is exposed. .

Standing on the top of the mountain and watching this scene, Zhao Cangqiong was deeply shocked. It was not only the speed of advancement, but also the connection and cooperation. It was impossible for the outside construction team to achieve it. It was not only communication and personal Technical issues in terms of skills are a kind of high-level tacit understanding that can only be formed through long-term running-in together.

This kind of tacit understanding is the only way to form a perfect cooperation. If everything depends on communication, after all, it needs reaction time, so it is impossible to be so perfect!

The entire valley floor runs north-south, with a width of about 4 kilometers from east to west and a length of about 8 kilometers from north to south. The construction vehicles below need to be pushed to the bottom first, then turned around to clean up and flatten the gaps left before, and return to the starting position. The entire operation Even if it is done.

In less than 2 hours, the cleaning operation was completed, the construction machinery left the site, the cleaning vehicles were parked aside, and the entire engineering team began to rest, waiting for the next order.

At this time, Lu Chenshan had already come up to discuss the next construction steps and progress requirements with Professor Han.

The next step is the excavation and construction of the foundation, the construction of sewage facilities, the erection of various underground pipelines, and then the construction of ground buildings.

After listening to Zhao Cangqiong for a while, he realized that there are a lot of special cement and steel in his warehouse space. If they are not used, they will be wasted. The system repurchase is too deceitful, so it is more cost-effective to use them up.

Zhao Cangqiong asked: "Professor Han, Captain Lu, I have a batch of special cement and steel. Can it be used if it is put into the project? What type of steel bars need to be processed from the steel? How much sand is needed?"

"Oh, for special cement, you can use it directly. For steel bars, you need several types. You can't produce this now, right?" Lu Chenshan said.

Zhao Cangqiong said: "Then just tell me which models you need. I can produce them very quickly, and I can deliver them in the evening!"

"Okay, then I will directly send this part of the document to your mobile phone. There are various specifications and corresponding quantities, otherwise it is too easy to make a mistake! The amount of other cement, sand and gravel is also on the above!" Lu Chen After Shan finished speaking, he took out his mobile phone and sent the file to Zhao Cangqiong.

Zhao Cangqiong asked in his heart as he walked out, "System, how much special cement and steel do I have now?"

[1286 tons of special cement, 152 tons of steel]

"Can steel be customized?"

[Yes, but you need to charge an environmental protection point for processing fees]

"If all the steel is processed into the specifications in my mobile phone file, how many environmental protection points do I need?"

[152 environmental protection points]

"Okay, give me all the steel and process it into the corresponding steel according to the requirements!"

[Received, processing... processing completed, please check]

"Is there any sand and gravel for super environmentally friendly buildings?"

[Yes, 1 environmental protection point 1 cubic meter]

"Give me 2000 cubic meters of sand and 3000 cubic meters of gravel!"

[Purchased, please pay attention to check]

Looking back, Zhao Cangqiong found that the various processing plants below, the prefabrication plant, the concrete mixing plant, the warehouse area, and the office area are all under construction, and it looks like they will be completed in the evening!
At the same time, the civil work has also started, and the entire foundation civil work is estimated to be completed by dinner time.

Taking advantage of the time when the warehouse was built and everyone went to eat, Zhao Cangqiong ran in and placed the steel bars, cement, sand and gravel in different areas according to the plan. Of course, it was impossible to put them all in at once, and it wouldn't fit, but Put about a quarter of it.

When Zhao Cangqiong woke up after a nap, he found that the foundation part had been poured and the construction of the ground part had already started!
The arrangement at Luchen Mountain is three shifts, and the accommodation is still in the railway station square, so that the night shift will not affect the rest of other non-construction workers, and the construction site is surrounded by mountains, except for a few families on the adjacent county road. will not be affected.

With Zhao Cangqiong's sufficient supply of raw materials, the entire project can be said to take an hour to complete.

Professor Han didn't know why he didn't leave after completing the planning and design, but became a technical guide and quality supervisor, which made Lu Chenshan's burden a lot easier.

After 7 days and 7 nights, the construction of the main body of the building was completed, and the project entered the stage of decoration and decoration.

Zhao Cangqiong will not be so relaxed in the following time, and many things need Zhao Cangqiong to complete.

During the previous construction process, the engineering staff found many strange designs with no idea of ​​their use. Now after Zhao Cangqiong installed the equipment that needed to be installed, everyone discovered that the design was so clever!
Including the exterior wall of the building is a super environmentally friendly plastic alloy customized by the system. The exterior wall of the entire building is a whole. The fixing place has been designed on the frame before, and only simple fixing is required.

Fortunately, during the design, Zhao Cangqiong and Professor Han communicated fully, otherwise it would be really troublesome.

It was another 7 days and 7 nights, and the decoration and decoration were all completed.

Final day for sweeping and cleaning before final delivery.

From the start of construction to the completion of delivery, it only took 15 days!
After looking at the fascinated building in front of him for a long time, Zhao Cangqiong sighed: "China's engineering construction team is the real infrastructure madman in this world!"

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like