Doomsday disaster: Start by building a shelter
Chapter 182 Large-scale Project
Through surveillance, we saw the kayak making a comeback.
A steady stream of tons of salvaged materials began to be successfully transported back to the Jingyuan Shelter.
That kind of super high transportation capacity.
Su Wu was very moved.
It is not easy to go through the psychological test of exchanging human lives for supplies.
But only 12% of the supplies are lost, and a large amount of resources can be brought home.
Then there will really be no obstacles at all.
It is true that the future is promising.
in front of the facts.
Su Wu quickly decided without much hesitation.
As long as there are no major problems in the next two or three days of testing.
Then he would immediately carry out the second round of expansion production of the spider robot.
Increase the number from the current 300 units to 3,300 units.
And all the newly added parts are delivered to the remote control center for use.
Strictly speaking, this testing period was not wasted.
The manufacturing center is currently producing medium-sized hovercraft at full capacity.
Even if the production task is issued now.
It will take two or three days to wait in line before the actual production of spider robots can begin.
"Next."
“It’s time to get started on the restoration of the Lime Refuge.”
This is a truly large-scale project.
In its complete state, the Lime Shelter has 1.1 million cubic meters of space.
It is divided into five floors, each with an area of more than 30,000 square meters. It's almost the size of ten football fields.
During the last super earthquake.
The entire first floor of the shelter was completely thrown from the ground to the surface, and more than two-thirds of the building was damaged.
There are also more or less problems on the lower 4 floors.
The bottom floor was even squeezed, leaving only a few hundred square meters of space.
But even so.
If it were completely patched up.
The effective space that can ultimately be used for survival can still reach about 700,000 cubic meters.
In addition, considering that it is only 7.5 kilometers away from Su Wu’s farmhouse in a straight line.
Belongs to the nearest affiliated shelter.
Even if it is simply used as an accessory warehouse, its restoration value is very huge.
Just before that.
Limited by limited manpower and resources.
Su Wu's own farmhouse lacked cement, so it was impossible to provide much support.
For the lime shelter, minor repairs are at best.
If you can barely carve out an area inside that can guarantee basic living conditions, you will have completed the mission.
And now.
The legacy received dozens of shelters, large and small.
The amount of cement that was rescued from it, or temporarily sealed in a waterproof warehouse, amounted to tens of thousands of tons later.
Su Wu already has the capital to carry out large-scale renovations to the Green Lemon Shelter.
Completely transform it into a complete sanctuary.
As for the labor required to fix it.
What Su Wu lacks most now is this kind of thing.
Restoring the Lime Shelter is not only not a burden to him, but also a channel to relieve the pressure of excess labor.
"There is a medium-sized hovercraft present."
"There is basically no need to worry about safety issues when workers and materials are dispatched."
"We can recruit 10,000 more workers for this purpose."
“It used to be a shift of restoration work.”
"Try to complete the repair within a week."
Plans are in place for a major project to restore the Lime Refuge.
The affairs accumulated in Su Wu's hands have basically been completely cleared.
Next.
He could safely devote most of his energy to the underground shelter in the farmyard.
For this core sanctuary where his true body is.
Although Su Wu did not dare to let the robot operated by the remote control center get involved.
However, cement, steel and other building materials can be used.
Lots of leaning over.
And with sufficient materials.
The engineering team located on the 9th floor underground can operate at full capacity.
The construction progress will once again be increased to more than twice that of the past.
It is expected to take another three days at most.
The construction of the 9th floor will be completed.
"Soon."
"Wait until the ninth floor is completed."
"The size of the shelter has basically reached the upper limit of a small shelter."
"One step further and it should be a medium-sized shelter."
"At that time, there will definitely be a phased reward."
Su Wu had some expectation in his eyes.
Based on his long-term research on the apocalyptic system.
At that time, there will definitely be a huge reward.
The reward will most likely not be survival points or ordinary props.
It is an evolution of rules that will bring about transformation.
Time, amid the raging floods on the surface, the constant heavy rain, and the labor and construction involving hundreds of thousands of people underground.
Flow gradually backwards.
Su Wu has lived through the end of the world.
A rare period of stability and rapid development.
August 30th.
Tens of thousands of construction workers took medium-sized hovercrafts and arrived at the Lime Sanctuary one after another.
Restoration work began on it.
The construction of the first phase of the Jingyuan Shelter Dormitory was announced to be completed.
After waiting for the initial solidification of the cement and simple decoration.
That night, the first batch of 10,000 people began to move into the dormitories.
And the space they freed up.
Then the construction of mushroom houses and earthworm breeding factories will be started simultaneously and seamlessly.
Expand the production of cheap food.
August 31st.
The number of medium-sized hovercrafts traveling through the ruins of surface cities has officially reached 30.
It can transport nearly 30,000 tons of materials every day.
same day.
The farmhouse manufacturing center completed the production task of medium-sized hovercraft.
Immediately continued to produce spider robots at a rate of 20 units per hour.
These spider robots.
Once you step off the production line, you will immediately be greeted by a Type 1 ore transport truck waiting outside.
Pull up to the lime shelter at the water's edge.
Then, together with the kayak and the humanoid service robot responsible for controlling the kayak, it was delivered to the remote control center of Jingyuan Shelter on the spot.
By the workers there.
Operate them remotely to salvage and transport resources in flood zones.
One to two million tons of materials stored in abandoned underwater shelters.
Since then, it has been decreasing rapidly at a speed visible to the naked eye.
They were continuously transported to the corresponding shelter warehouse by medium-sized hovercraft and kayaks.
Su Wu's capital is in this busy transportation of materials.
Gradually strengthen little by little.
Steadily approaching the standard of a super large shelter.
September 1st.
The remote control center adopts the method of operating workers in shifts.
Control thousands of spider robots and a corresponding number of kayaks to salvage underwater supplies day and night.
The efficiency of transferring materials has been increased to a terrifying level of 30,000 tons per day.
And this is not the limit.
With spider robots still coming off the production line, and newly produced kayaks.
in the near future.
Their daily transportation volume will exceed 70,000 tons.
You'll Also Like
-
Kyushu Daoist Master
Chapter 1241 1 hours ago -
Doomsday disaster: Start by building a shelter
Chapter 208 1 hours ago -
My Fairy Fiancee
Chapter 518 10 hours ago -
Global Famine: My items can be automatically upgraded
Chapter 515 16 hours ago -
Zongman: The God in Question Comes from Arcadia
Chapter 1021 16 hours ago -
Start with a blood-drinking sword and destroy the world of immortal cultivation
Chapter 246 16 hours ago -
Bleach: The Captain of the Fifth Division Becomes Stronger Through Training
Chapter 247 16 hours ago -
Imperial Crown
Chapter 314 16 hours ago -
My brother is so cunning.
Chapter 521 16 hours ago -
My vests are all big guys
Chapter 99 16 hours ago