Doomsday I Have A Super Survival System
Chapter 137
Chapter 137 136. Subway Construction Plan
This time, it is a workshop dedicated to the production of vehicles and general equipment.
The production line in this workshop is more complex and larger.
The height of the fourth floor is about ten meters, which is constructed by Ankai according to the needs of the workshop, which requires the highest height. That workshop is dedicated to the manufacture of military vehicles, such as tanks, such as armored vehicles. In reality, the workshop that produces these armored vehicles needs a high ceiling. He doesn’t know. Anyway, the system requirement is ten meters, which is also in all workshops. The most highly demanding.
Then estimate the space directly according to this standard.
Others, such as the firearms production workshop, and the general vehicle production workshop, do not have this height, it does not matter, what he needs is the fourth floor of the ground, leaving a sufficient distance of eleven meters from the third floor.
The elevator shaft needs to be dug deeper, but is this a problem?
The elevator shaft can be said to be the least demanding of all system buildings. It requires less space and can be extended down or up at will, not to mention how simple it is to expand.
As long as An Kai is willing, he can even easily drive the elevator into a depth of hundreds of meters underground, but there is no need to do that temporarily.
However, Ankai has a plan, and it is a very large plan, that is to sub-base!
After all, a shelter has its limits. No matter how it develops, it is theoretically limited by local resources.
In the land under his feet, the most resource is aluminum ore, then coal mine, followed by iron ore… and then there is no more.
Other associated mines are naturally available, but the scale is too small, and the systematic mine has a big drawback, that is, those associated mines cannot be collected.
Associated mines and main mines will appear 100% in the same deposit, and basically have no separate mining value, but useful minerals or elements that can be exploited together with the associated main minerals.
For example, platinum, zinc, gold, etc. in porphyry copper deposits, wolframite ores; tin, molybdenum, min, ni, dan, mi, and crystals in british vein deposits. Associated minerals are relative to the main minerals. Because they have similar geochemical properties and common material sources, they are often associated in the same deposit.
Associated minerals may occur in independent minerals, such as bauxite in porphyry copper ore; or they are isomorphic or mechanically finely mixed, and are contained in the main minerals, such as galena and sphalerite. Tin, indium, gallium, germanium, etc. It is necessary to carefully study their occurrence status and distribution characteristics in order to adopt reasonable beneficiation and smelting processes for recycling and comprehensive utilization.
In short, in reality, no matter what kind of mineral it is, if it encounters associated mines, it will probably be produced at the same time.
This is not the case for the system.
Under the system framework, a mine can only set one type of mineral, and then the mine’s probe will be very rigid and only mine this type of ore, and the mining time is accurate, absolutely black technology level, it stands to reason that the associated mine and the main mine itself It is difficult to distinguish each other completely, but the system mine can do it. If iron ore is mined, iron ore must be mined. If there are rare earth associated ore in the iron ore, then I’m sorry, the mine will not take care of it at all, and even take the initiative to separate it very intimately, which is very depressing.
Therefore, if you want to diversify materials, it is a necessary requirement to get out of the land here.
Expansion on the ground is definitely impossible, unrealistic, and too dangerous, so Ankai’s plan is to open the base through the subway.
The manufacturing of the subway is not difficult.
At least for him who owns the system.
The first is to build the tunnel. This is very simple. The system provides a special tunnel template, and it is OK to build it directly. Many underground railway tunnels are smaller than those on the main arterial lines; therefore, in general, underground railway trains are generally smaller in size, and the construction of tunnels saves materials more than the building of shelters, but considering the length of the subway , If the total is added up, it becomes a very exaggerated figure.
Then there is the laying of railroad tracks. This step is the simplest in theory, but Ankai has to consider a more practical issue, which is the power of the subway.
There are also several subway power schemes provided by the system, but at present, the most suitable shelter is definitely rail power supply, which is also one of the most common methods of railway electrification.
There are many benefits of rail power supply. Among them, the most important thing in Ankai is that the cost of installing live rails is often lower than that of catenary, because catenary needs brackets and circuit rails are not used. In fact, the cost issue is the main reason why many rail power supply systems have not switched to catenary. Secondly, the impact of natural disasters on live rails is less than that of catenary, except for flooding, which he does not need to consider, because there is no flooding underground. Then the live rail is more suitable for installation in tunnels with smaller headroom than the catenary. On the one hand, it also saves the consumption of manufacturing tunnels. Finally, some passengers think that the catenary is unsightly. In contrast, the visual effect of live rails is better. Of course, this reason is not important.
As for shortcomings, there must be some.
For example, exposed live railroad tracks are dangerous, this Ankai does not need to be considered. The voltage issue needs to be considered carefully, but as long as there are enough generator sets and stable enough, the problem is not very big.
The problem of current loss needs to be considered, because the charged track is close to the ground, so sometimes the current is lost to the ground. Some electrified tracks will be added with aluminum bars to reduce current loss. However, because the expansion response of aluminum to heat is different from that of steel, in order to avoid damaging the live rail, both sides of the live rail must be bolted tightly by aluminum bars. Fortunately, there is really no shortage of aluminum here, so this problem is solved smoothly.
Others, it is not a problem.
The operating system of the subway itself does not need to be considered, because he currently has only one subway plan, so he just needs to keep going.
The last and most important issue is the vehicle issue.
This is the real trouble. For Ankai, subway vehicles are more troublesome than tunnels, rails, power and systems combined, because subway trains are larger and more professional vehicles than ordinary vehicles. , So the fifth-level engineer alone is definitely not enough, and other skills are needed to support it. This inevitably has a certain conflict with Ankai’s current skill addition plan. If this is added first, then the plan to strengthen oneself must be released later.
On the contrary, the development of the subway will take longer.
The material is of course important, but An Kai should also be appropriate for Ascension own personal strength, both are important, so he is now more difficult to make a choice on this.
As for the materials of the vehicles, it is a problem, not a problem. The material is definitely not enough, and you have to save, but the main material is still aluminum, which makes An Kai feel a lot relaxed.
Still the same sentence, but other materials, only aluminum, he really does not lack.
The output of aluminum may not be high, but the place he needs to use at present is still too few. A large amount of aluminum ore has accumulated. The aluminum ore in the material warehouse alone is more than iron ore and coal mines combined. In the case of the subway, it is definitely not enough. But judging from the ratio of the three types of minerals, as long as the number of mines is increased, it is not difficult to replenish them.
The subway construction plan was therefore put on the agenda by An Kai. After he completed the construction of the fifth floor and laid out all the equipment, the next step was the determination of the direction and the construction of the subway station.
In this process, they will also complete the first transaction with the Herto survivors in exchange for the various materials they need.
You'll Also Like
-
Peerless: Gu Master Transforms Douluo.
Chapter 321 3 hours ago -
I became an immortal in the mountains
Chapter 568 3 hours ago -
The Dutian Lingguan Road that started from the Taoist soldiers
Chapter 425 3 hours ago -
Dragons only want to be in the water, and don't like to stay in the wilderness
Chapter 434 3 hours ago -
Anti-Qing: Starting from the Jintian Uprising
Chapter 505 3 hours ago -
Douluo: Reincarnation, the King's Power Never Dies, Unrivaled in the World
Chapter 273 3 hours ago -
Under One Person, the little witch only wants to collect elves
Chapter 420 3 hours ago -
The Strongest Soldier: From Being Specially Recruited into the Army
Chapter 174 3 hours ago -
People in Doupo: The beginning of the game intercepts the rich woman Xun'er
Chapter 550 3 hours ago -
60s: I have a store
Chapter 503 3 hours ago