I Have a Little Black Hole

Chapter 562 The construction of the nuclear fusion power station officially begins!

Not only the country thinks so, even the energy companies have not given up on the nuclear fusion reactor technology of several other routes, and the people in the laboratory have also conducted preliminary research and discussion on those technologies, but at this stage they are still using their hands. The technology provided by this boss on the main.

A thousand birds in the forest is not as good as a bird in hand. There is already a commercial nuclear fusion reactor technology. Of course, we must first focus on this technology, and tap the potential and continue to carry out in-depth research and development. What the Infinite Gravity Group needs to do now thing.

As for the technologies of other routes, keep paying attention and discussing, so that your knowledge reserve is not behind. Of course, some basic research and design work can also be done simultaneously, but it should not be the mainstream.

And the country here has already passed the company's application for the construction of the experimental reactor of the nuclear fusion reactor for the first time, so of course the energy company will start construction immediately!

It is said that it is an experimental reactor. In fact, the scale of the nuclear fusion reactor that Lei Tiantang arranged for the energy company to build is in accordance with the requirements of the demonstration reactor.

After all, the real experimental reactor has already been built, and the nuclear fusion reactor at the submarine base is the real experimental reactor. It has been running smoothly for several months. So far, all the performance indicators have fully met the design standards. With this confidence, it would be a waste of time to repeat the construction of a small-scale nuclear fusion experimental reactor.

Therefore, even if the application is for the construction of an experimental reactor, both in terms of the design scale and the design of supporting facilities are designed according to the scale of a formal nuclear fusion reactor power plant.

Although the experts of the audit team and the country know this, no one has blocked it. Since the Infinite Gravity Group dares to do this, it must be very confident in its own technology.

And doing this is also good for the country. If it is built according to the demonstration reactor, as long as there is no problem, it can help the country save at least half a year of technical observation time. This is not only good for the Infinite Gravity Group. This kind of preparation is also beneficial.

For the country, if it can be determined that the technology of this nuclear fusion reactor power station is mature and available half a year in advance, then the relevant policies and adjustments to the market can take more than half a year to prepare, because there is no confirmation that the technology is indeed When it is mature and available, it is impossible to do too much action, otherwise if the experimental technology fails, those adjustments will become troublesome.

Lei Tiantang directly asked the energy company to build the demonstration reactor. On the one hand, he was confident in the fusion reactor technology developed by him and Kuafu, and on the other hand, he considered the company's interests.

You must know that the companies and factories that the Infinite Gravity Group has built and put into production, and the projects under construction are all large energy consumers. Even with the scale of the Infinite Gravity Group, everyone is muttering when they pay the electricity bill every month!

You must know that the electricity consumption of the company is charged according to the standard of industrial electricity consumption. The monthly electricity bill of Infinite Gravity Group is as high as 200 million yuan or more!

That is to say, the electricity bill paid in 3 months will have to be 100 million US dollars. This kind of cost expenditure is acceptable, but the company uses so much electricity every month, and the pressure on the government is not small. The electricity load brings a lot of burden to the line and power distribution.

In order to ensure the electricity demand of the Infinite Gravity Group, the Hefei Municipal Government specially asked the power company to pull a special line for them and installed several high-power transformers.

But as the scale of the Infinite Gravity Group becomes larger and larger, the government's preparations will soon be unable to keep up. Let's not talk about other things, let's talk about the Interstellar Age Research Institute under rapid construction!

After the Super Large Hadron Collider was built, more than 10 million kWh of electricity was needed to start an experiment once, and it was still a short period of time.

This has even more stringent requirements on the power grid!

Also, the rapidly expanding supercomputer unit, the closed ecological farm laboratory under construction, etc. are all energy-intensive, and there are some other construction projects. If these things are launched this year, the Infinite Gravity Group will only be every Monthly electricity consumption can reach more than 300 million degrees or even higher!

The electricity bills are paid by the Unlimited Gravity Group, but the power grid can't afford it! You must know that even in the hottest summer last year, the electricity consumption of Hefei City in a month was only nearly 4 billion kWh!

Now your company's monthly electricity consumption will occupy about one-tenth of a city's electricity consumption, and the power grid will definitely not be able to bear it during the peak electricity consumption period.

So if the company builds a power station for itself, and then pulls a special line to supply power to the company, then it can be used as you want!

With the application scale of the nuclear fusion reactor power station built this time, even if the infinite gravity group can do it again, its electricity consumption is a drop in the bucket for the power generation of the reactor, and the remaining points can still be used at a very favorable price. If you sell it to a power company, even if you sell it for 10 cents, the Infinite Gravity Group will not lose money. After all, this reactor is mainly to ensure the safety of electricity consumption in the later stage of the company, and making money is incidental.

Such cheap electricity can at least benefit the entire city of Hefei and the surrounding cities, and it can make the city's economic development faster. Of course, the government can see the benefits in this regard, and the country is also prepared to The experimental city for policy adjustment is placed on the side of Hefei City.

The land for the construction of the nuclear fusion reactor has been prepared for a long time, and the initial work such as the leveling of the land has been prepared.

Although the safety of nuclear fusion reactor technology is much higher than that of nuclear fission reactors, there are still dangers, so this time the reactor construction location is not far from the company's rocket engine static experimental base, which is also in that small mountainous area.

The geological structure here is stable, and there has never been a major earthquake, so safety can still be guaranteed, and there is only a 5-minute helicopter flight from the nearest military area, which minimizes the possibility of human invasion!

A normal-scale intrusion security company can prevent it, but what if other countries resort to a large-scale intrusion at any cost? This kind of thing may not happen, but the preparations for the sitting still need to be done. After all, this possibility is not large, but it is not impossible.

()

Please remember this book's first domain name: . Mobile version reading website:

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like