urban security

Chapter 252 Busy Construction Site

The sound of the construction vehicle loading soil was not pleasant. There was only a clang as a pile of soil was put in. The roar of the excavator digging the soil was even more annoying. The sound was sometimes dull and sometimes relaxed. When the machine dug into the soil, black smoke gushed out from the tail pipe.

When the soil from the excavator shovel is put into the vehicle box, it seems to become very comfortable. It is just like the situation before and after a person goes to the toilet in a hurry. The difference between loading and unloading is too obvious.

On the loess slope. The engineering vehicle pulled the soil to the designated location. Dumped it out, and then returned to the south to load the girl. Let the excavator dig the soil underground deeper before loading it in. There is an excavator in the iron box, which is said to be half a cubic meter. The soil above is loaded into the carriage and put into the carriage. The collision sound with the carriage is very heavy, and the empty truck and them. Clang sounds happen from time to time. A dump truck can load about 20 cubic meters, and it takes about dozens of minutes to load.

27 Rotate left and right. That. In the chimney. That surface, sometimes there is no light. When you use more strength, thick smoke comes out when the fish head is loaded, and when it is not loaded. That green smoke. The heat is emitted from that. Behind the internal combustion engine. The three-way platform in the trunk is emitted. During the day, you can see that young man is operating various instruments in it skillfully. He presses the brake button, takes off and lands, puts down, digs the soil, levels, moves forward, moves backward, and rotates.

Do one, there is. The front desk account of the inspection, the digging, the excavator master uses the bucket to give him both sides. Smooth it out, because the big head of the house falls on the flesh. Some excavator masters do a good job, and some excavator masters don't care so much. It is inevitable that mud will fall from the ground, making the cement road surface. It's a mess. On sunny days, dust flies. This is really the sound of horse hooves, flying. On rainy days, it's a place without puddles, but fortunately the road is made smooth.

That is also true. Your loess is like a knife when it rains. When it rains, it cuts the knife when the sun comes out. On the muddy road, although it is hardened, once you step on it, it will also make your blood sucking dirty. After the excavator and the muck truck repair, a junior high school is repaired into the shape of a construction unit. It is quite compassionate.

It is in the shape of a trapezoid from top to bottom. I don't know what it is for, and I don't know what kind of building it is. It may be a place for spiritual practice. It may also be a large entertainment venue. Open the door quickly. I'm not saying it's so big that it will be fine once you get out. But. This project.

The man started the machine while talking. I used the intercom to pass the information about the gate to the project manager. The person in the project department immediately said that they were looking for them and asked me to let him in. There was nothing I could do. The project department asked me to let him in, so I had to bite the bullet and stand in the rain.

Go open the door for him, because we don't have an umbrella here, there's no umbrella, no umbrella, we just. Then upgrade. Just open the door for him, and hit him in the rain. That's not necessary, so you get yourself soaked, and then the wind blows over and the door can't be opened. The door that was opened was also blown to the other side by the wind, this, this is terrible. That person also this year. Sitting in the car, one by one, one by one, one by one. I'll take you to blow in the rain this afternoon


Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like