Rebirth 05, starting from never dusting
Chapter 341: Did you paste the bricks in the back pouring tape for me?
After entering the rainy season, the weather in Quanshui City becomes sentimental.
When I went out in the morning, the sky was clear and the heat was overwhelming.
At noon, the clouds immediately became overcast and it rained heavily.
Although the rain was heavy, it unfortunately lasted less than an hour. It was almost time to go to work, and there were only thin strands of rain floating in the air.
The sun was hidden behind the clouds, steaming the sparse raindrops into mist. The entire city seemed to be in a huge steamer, making people on the construction site miserable.
Zhang Yi returned to the construction site the next day after his eldest brother's wedding. He encountered such weather as soon as he went to work. To be honest, he felt a little uncomfortable.
"Old Shen, are there any buildings that need to be inspected today?"
Although the air in the air-conditioned room is comfortable, after a long time, my neck can't stand it and my head feels a little painful.
It is even more impossible for Zhang Yi to let her suffer. If her foot is pricked like last time, or she suffers from heatstroke or something, the little brother will definitely be sad.
After all, the gray quality of commercial concrete today is acceptable. Even if a little water is added, the concrete is vibrated in place, and the concrete surface is very smooth after the formwork is removed.
"Brother Zhang, do you still want me to follow you and take pictures?" Sun Li chased after him with a digital camera and asked.
Wait, this place looks familiar.
When Zhang Yi was not at the construction site, Shen Ye rarely arranged for her to work on the construction site.
Shen Ye on the other side of the phone thought for a while and said: "The roof of the second floor of Building 1 in Zone A of the second bid needs to be inspected. If you don't want to go, I can arrange for Lao Hu to go."
It's broad daylight, how dare you act like an old man carrying a bucket!
And looking at the skilled postures of the two old men, well, the entire row of frame beams were filled with holes using this method of stuffing bricks.
Sun Li sighed in embarrassment.
Zhang Yi smiled and said nothing more.
"Okay, then I'll sleep a little longer and call me if you need anything."
I have never seen anyone so heartbroken!
Well, sometimes sleeping too much is not good either.
My brain seems to be awake, but the various organs in my body haven't recovered yet, so I need to slow down.
You can at least carve out the frame beams, moisten them with mortar of the same proportion, and then pour expanded concrete ash...
Zhang Yi took the camera and said, "No, it's hot. You can sort out the materials in the room."
The main reason is that Sun Li is willing to endure hardships. After confirming her boyfriend and girlfriend with Wang Jiaxin, she is influenced by big brothers such as Zhang Yi and Shen Ye. Now she is particularly eager to make money.
What is the leakage of vibration here? This is the back pouring tape. There is no need to paste this place at all!
The purpose of the post-casting belt is to prevent harmful cracks that may occur due to temperature, shrinkage, etc. when pouring in-situ concrete. According to the design requirements, temporary construction joints are left in the foundation, floor, beams, etc.
Zhang Yi looked down at the foundation and instantly covered his forehead.
After blowing on the air conditioner in the office for a while and drinking two cups of tea, Zhang Yi finally calmed down. He picked up his safety helmet and steel tape measure and went out for a walk at the construction site.
In June, Zhang Yi hardly went to work and was busy with online school and family matters.
I was exhausted during this period. As long as I stayed in the company for one day, I would be busy with endless things. I was either taking classes or being dragged into meetings by Yu Shuang to negotiate specific ideas for obtaining academic diplomas.
Generally speaking, as long as the frame columns of this type are vibrated well during dusting, there will be basically no leakage of steel bars.
Sun Li smiled and served him hot tea, then returned to her seat and was busy with her part-time job.
Hey, these grandsons are so brave that they actually stuffed bricks into the frame beams and pretended to be concrete!
One hundred and ninety two. Two hundred and twenty seven. One hundred and fifty five. One hundred and fifty three.
"Brother Zhang, how much does it cost to buy a house in the city?" Sun Li asked.
After hanging up the phone, Zhang Yi fell asleep.
Shen Ye was worried that he would not adapt to life on the construction site, so he never arranged a job for him.
"Brother Zhang, are you up?" Sun Li saw him coming in and quickly got up to boil water and make tea.
Zhang Yi immediately looked along the place where the two workers were setting up a stand. It didn't matter what he saw, he was about to explode.
Of course, this phenomenon mostly occurs on the first layer, because the templates (bamboo plywood or plywood) used in the first layer are new, the inner walls of the templates are smooth, and the gray look is very good.
But taking into account the 600 monthly part-time job at the online school and the cost of data contracting, her current income is also very considerable!
Zhang Yi said: "The average housing price in urban areas this year is almost 4000, and a house in a better school district is estimated to be around 5000. What, you two are making such rapid progress, are you planning to get married?"
Zhang Yi said: "Don't look at it, the house price will be more expensive next year, so if you want to buy it, do it early!"
After working in construction for two lifetimes, it was the first time for Zhang Yi to see such a bold move.
The second bid section was not big, so Zhang Yi quickly arrived in front of Building No. 1. He did not rush upstairs, but went inside the building to check the condition of the concrete after the formwork on the first floor was removed.
Sun Li is now considered a regular employee of Quanjian, and her salary is not high, 900 yuan, plus a living allowance of 3 yuan per day.
There were several templates pasted on the frame beams, and a few bricks could be vaguely seen between the templates.
After turning off the air conditioner and opening the door, a wave of heat hit his face and almost pushed Zhang Yi back.
Lying on the bed in the dormitory, Zhang Yi turned on the air conditioner and called Shen Ye.
There were a lot of wooden squares, formwork and nails under his feet, as well as a lot of steel pipes. Zhang Yi carefully avoided them and looked at the appearance quality of the concrete of each frame column.
Sun Li is not only a colleague, but also half an employee, her younger brother's girlfriend, and even her school girl.
Zhang Yi rubbed his eyes, said "hmm" and sat in front of the computer in a daze.
Zhang Yi carefully avoided his feet and used a tape measure to measure the geometric dimensions of the frame columns from time to time. Suddenly, he heard the sound of dragging steel pipes from the front.
Suddenly, Zhang Yi became interested. There must be a phenomenon of large-scale muscle exposure that he had not discovered, otherwise he would not have arranged for two old men to carry buckets to mend the holes in broad daylight!
I slept until after four o'clock, but couldn't sleep anymore. Zhang Yi got up and shook his neck.
Going to work has become a good excuse for Zhang Yi to be lazy.
At least among her peers, there are few people with such a high income.
"Huh?" Zhang Yi heard the sound and went to see two workers holding steel pipes and preparing to set up a shelf. There was a small bucket at their feet. Inside was something Zhang Yi was so familiar with...cement ash.
If it reaches the second floor, after the formwork is recycled and used, the quality of the concrete surface will gradually decline and even become terrible.
The post-casting belt can temporarily divide a large overall structure into two sections (or even multiple sections). Generally, after the design requirements are met, the high-grade expanded concrete ash is used to vibrate and pour the structure to connect the entire structure into a whole.
Zhang Yi didn't expect that Huang Bo would do such a ridiculous thing after he had only been away from the construction site for half a month.
I can’t imagine what a mess the construction site would be like!
You'll Also Like
-
American comics: Old Wolverine, do whatever he wants
Chapter 120 5 hours ago -
Global Escape: My RV and My Robot Army
Chapter 271 5 hours ago -
Universal Lord: Building an Immortal Fairyland from Scratch
Chapter 862 5 hours ago -
Reincarnation Spider: The Mysterious Queen
Chapter 627 5 hours ago -
Traveling through Huo Yuhao, my abilities are refreshed every month
Chapter 524 5 hours ago -
Ice and Fire: Reign of the Dragon
Chapter 150 5 hours ago -
Daqin: Start to become stronger and live longer by picking up attributes from the battlefield
Chapter 320 5 hours ago -
You said you would ascend to the immortal world, why did you end up in a mental hospital?
Chapter 46 5 hours ago -
Idle game leads to another world
Chapter 1429 5 hours ago -
Pirate: I am an old veterinarian, saving you is like breathing!
Chapter 251 5 hours ago