Rebirth 05, starting from never dusting
Chapter 407: The job is easy, but not everyone can do it.
As soon as the boss opened his mouth, other fishing experts immediately flattered him.
"Yes, yes, I was just wondering what the last bit of dirt was, but I didn't expect it to be sediment!"
"I was also wondering whether the construction unit did not dig enough pile length, and the drilling team drilled out the soil according to the designed pile length."
"Doesn't the construction unit have to clean the holes before pouring?"
"This design institute also works on water. It has to use dry hole forming technology to make mud walls, isn't it?"
"You see, this place is not enough for him. Where can he get a mud pool..."
The industry leader made the final decision, and other experts instantly found the direction and expressed their opinions one after another.
The more Mr. Wang listened, the more headache he got.
I haven't designed the official drawings for this project yet. If it goes according to your wishes, this drawing won't even pass the review.
If the pile foundation construction technology is replaced, not only will the construction cost increase, but the overall project schedule will also be delayed.
Damn it, these experts really don't mind the excitement.
"Professor Shen, tell me, how should we handle this situation better?"
"According to the specifications, it needs to be reworked." Brother Shen pointed to the foundation pit and said: "There are only 54 pile foundations. Pull them out one by one, clean the holes again, and weld the steel cage into the holes..."
"Is there a faster way?" Mr. Wang interrupted rudely.
"Yes, but the cost of rework is the lowest." Brother Shen said with a smile.
Mr. Wang had a painful expression on his face.
Maybe the cost of rework is the lowest, but the Chinese Group can't wait!
Not to mention anything else, it would take at least half a month to pull out the 54 cast-in-place piles one by one with a crane.
This is still a relatively smooth situation.
If something goes wrong, you have to cooperate with the excavator for excavation, but in this case, it is no different from large-scale foundation excavation, and it will also cause certain damage to the original soil layer.
In order to ensure that the foundation meets the designed bearing capacity, the design institute will definitely expand the pile diameter, steel bars and concrete markings...
This process took three months to complete.
Rework... seems to "save money", but the time cost is actually magnified.
Developers wish they could build the house and sell it within a month, so how could they waste time on rework?
"Don't you want to rework?" Brother Shen asked.
Mr. Wang nodded vigorously, wishing he could shake his head off.
"Hey, from a quality perspective, rework and rectification is ideal."
After Brother Shen sighed, he continued: "Since you don't want to rework, you can only adopt basic reinforcement measures."
Mr. Wang asked eagerly: "How long does it take to reinforce?"
Brother Shen said: "We need to demonstrate this and try to adopt the most economical and time-saving reinforcement plan."
"Okay! Then let's go back and argue."
Mr. Wang, with a look of impatience on his face, took the lead and led everyone back.
It is best to come up with a plan first and then reinforce it. It is best to solve the problem within a month.
Even if the economic cost is slightly more than rework, it is acceptable.
Mr. Wang was thinking in his mind.
Time is really not enough.
It is now mid-November, and we plan to build the pile foundations for the two buildings #11 and #1 that face the street and have the smallest area by the end of the year.
Returning to the conference room, Mr. Wang could no longer allow these experts to mess around.
After taking the microphone, he took the initiative to ask Brother Shen for details on reinforcement.
At this time, Brother Shen's authority was fully reflected.
Various professional terms came out of his mouth, and the people present, including those from the design institute and survey unit, could barely understand them.
Even Zhang Yi couldn't understand many of the words. He couldn't help it. Every line was separated by a mountain. There were some things he had never been exposed to before, and he had no concept at all.
Anyway, the boss is awesome, just shout 6 and that’s it.
Brother Shen took good care of everyone's emotions and quickly proposed the key link of foundation reinforcement.
This time, several experts stopped jumping around.
Their little professional reserves were not even qualified to carry Brother Shen's shoes, and they didn't even have to be polite. They directly recommended him to announce the reinforcement plan.
Brother Shen was not polite and provided two reinforcement plans in public.
One is to require the design institute to comprehensively check the foundation bearing capacity on site by increasing the width and height of the cap platform and raft foundation.
The advantage of this reinforcement scheme is that the cost does not increase much, but the disadvantage is that it may take a long time.
Not to mention whether the design institute is willing to cooperate, it is also necessary to understand the bearing capacity of each pile and divide the areas according to the strength of the bearing capacity, which is time-consuming and labor-intensive.
Before Mr. Wang said anything, the design director of the design institute first expressed his opinion.
"Professor Shen, our institute thinks this solution is a bit troublesome. Single pile grouting reinforcement is more flexible and economical, and the key is to save time."
Brother Shen chuckled.
This is the reinforcement plan proposed by your design institute!
Upon hearing this, President Wang of Party A immediately looked at the design institute.
"Since Mr. Liu has proposed grouting reinforcement, he must have some ideas. You might as well speak up and listen."
President Liu She quickly shook his head and said, "I just heard about it, let Professor Shen explain it."
Damn, you want our design institute to come up with a reinforcement plan, but there’s no way!
If it is still not up to standard after reinforcement, you will definitely blame our design institute.
If there were no risks, our design institute would have come up with a plan long ago, and it would be your experts' turn to grab the food.
"Where are the other experts?" Mr. Wang asked.
All the experts shook their heads and looked at Brother Shen.
Brother Shen coughed twice and said: "Then let's discuss the second pile foundation high-pressure grouting scheme for pile bottom sediment. This is a relatively mature reinforcement scheme suitable for the south, especially complex terrains such as karst... "
When it comes to the core key, Brother Shen tries to make it as easy to understand as possible.
After a few minutes, Mr. Wang and other people from Party A all understood that the job was easy, but not everyone could do it.
Professional qualifications for foundation reinforcement are required!
"In terms of time for grouting reinforcement..."
Brother Shen said: "If there is no accident, it will only take 20 days."
Within 20 days, Mr. Wang said he could accept it.
Today's expert demonstration was relatively successful, and the two things Mr. Wang expected were accomplished.
The responsible party for the quality accident was determined, and the pile foundation construction team designated by Mr. Wang assumed full responsibility.
After demonstration, the pile foundation reinforcement plan and reinforcement units were determined.
The reinforcement unit has no choice but to choose Brother Shen. Who knows that he is an expert and has qualifications in this field.
Industry authorities are not bluffing.
All the experts signed their names on the argumentation sign-in form and happily left with their appearance fees.
As soon as the door of the conference room was closed, Mr. Wang hurriedly came next to Brother Shen.
"Professor Shen, don't say anything anymore, hurry up and make arrangements for reinforcements!"
Brother Shen nodded and said, "Okay, I'll get a formal plan when I get back. We can make preparations before demonstrating again."
"Then... I have a heartfelt request." Mr. Wang looked at Shen Ye.
"Mr. Shen, can you help us? Let our construction site resume work first."
Shen Ye was stunned for a moment, I just came here to take advantage of others, it's none of my business.
Zhang Yi kicked him and whispered: "It's okay to resume work. Just take down the pile foundation construction in the entire area."
Shen Ye was in high spirits. Damn it, it had to be Lao Zhang who took advantage of the situation and robbed Liu's group!
You'll Also Like
-
My life of martial arts training
Chapter 745 1 hours ago -
Fairy sister from heaven
Chapter 369 4 hours ago -
Evil Hero
Chapter 409 5 hours ago -
Throne of the North
Chapter 417 6 hours ago -
Doomsday: I Build an Infinite Train
Chapter 110 6 hours ago -
Become a wizard lord with a copy system
Chapter 126 6 hours ago -
Bro, you are a policeman, not a thug.
Chapter 505 6 hours ago -
Extract Xiuxian University at the beginning
Chapter 127 6 hours ago -
Cyberpunk: 2075
Chapter 384 6 hours ago -
Fantasy Library
Chapter 119 6 hours ago