It took about two days.

The whole structure of the house has been dismantled.

All non-load-bearing walls that were in the way were also demolished.

And with it.

It is that more problems inside the house are exposed.

The first is the aging of the walls.

The walls of the eastern house are often exposed to wind and rain.

The entire wall structure shows signs of erosion.

This is not good news.

If the entire wall is severely eroded, the entire building will become dangerous.

Not only that, but if you want to renovate, you have to demolish the entire winter structure

Fortunately, the corrosion is not serious now.

It happened to be discovered by Li Yueming in time.

After discussion between the construction team and Li Yueming.

A group of people decided to install a steel structure inside the house.

And the façade of the walls is painted with special rainproof and waterproof paint.

A special spray is then used to reinforce the hardness of the wall surface.

In this way, although there is no way to directly repair the house.

But it also prevents the house from continuing to age.

The waterproof paint of the exterior can be used for ten years.

Ten years later, another layer can be added another decade.

Special sprays that reinforce the surface of the wall can make the wall less vulnerable to rain.

The steel structure inside the wall is the last line of defense.

Even if the walls show signs of aging, the steel structure can support the main body of the column house.

This is Li Yueming’s favorite method.

Three layers of security to ensure that nothing goes wrong.

As for why not just repair it.

Naturally, because the scope of construction required is too large, Aunt Yan’s budget is not enough, and more importantly, the rain erosion situation is not too serious.

There is no time when a big start of construction is necessary.

Besides.

When demolishing the walls.

Li Yueming found that there was still a big problem with the drainage of the house.

All drainage from the house is connected to a single sewer pipe.

If you want to build a new bathroom and toilet on the second floor.

So where this sewer pipe is going to connect becomes a new problem.

Direct access to the ground floor bathroom is the most common practice.

But by doing so, Li Yueming felt that it would cause excessive sewage pressure on the sewer pipe.

At that time, there is a little more troublesome problem.

For example, blocked sewers.

This results in the entire house having nowhere else to discharge sewage.

Therefore, after Li Yueming’s careful planning.

A sewer pipe was connected to the municipal sewage pipe downstairs on the second floor.

One by one a problem was identified.

Then they were solved by Li Yueming one by one.

In the blink of an eye, the time passed.

During this time, the overall structure of the entire old house has been redivided.

It’s just soft and hard interior decoration.

In the live broadcast room, many viewers have already been mentally prepared.

But Li Yueming’s construction progress is still a little shocked.

“I’m dripping turtles, Mr. Li, this is also too fast!”

“It’s only been fifteen days, and the internal structure of the entire house is almost complete!”

“The other designers are just starting to remodel!”

“It seems that Mr. Li is going to face other designers from the speed this time to cause dimensionality reduction blows!”

“I just don’t know how well the house is actually renovated.”

“Teacher Li personally handled it, do you still have to doubt this?”

“Yes, Mr. Li personally operated, the transformation effect will definitely only exceed our imagination!”

“Brother Yueming, always drop God!”

“I feel that Teacher Li is really a freak, and he is too skilled in doing things on the construction site!”

“Even the workers can’t compare to him!”

“Teacher Li: I didn’t expect it, I’m a professional!”

In the live broadcast room, many viewers were all amazed.

The speed of transformation of Li Yueming.

They are still very convinced.

It is advancing almost every day visible to the naked eye.

Other designers have a hard time and may have to think about it for hours.

After Li Yueming encountered the problem, he would immediately discuss with the construction team on the front line

Aim to hammer out a solvable answer in an hour or so in the process.

The richness of basic knowledge, the sharpness of thinking, and the speed of decision-making displayed by Li Yueming are all first-class!

This kind of fierce performance alone shocked many audiences!

Basically, there are very few problems that can stump Li Yueming for more than an hour

It is precisely because of such an efficient working mode.

Li Yueming’s current construction progress has been far away from other designers.

The construction time for the third round of renovation should be thirty days.

But Li Yueming gave himself about twenty days for construction.

That’s ten days ahead.

Other designers are still using thirty days as the construction deadline.

The gap in construction progress between the two can naturally be imagined.

After completing the basic layout transformation.

Li Yueming began to work on the renovation of outdoor drainage canals.

As mentioned before, there is an open-air area on the roof of Aunt Yan’s house.

This open-air area has water standing up when it rains.

Because Li Yueming changed the position of the door.

Now the door exit of Aunt Yan’s house is located in the open-air area.

These stagnant water will first cause Aunt Yan’s house to go out or go home on rainy days.

This is definitely not going to work.

Therefore, Li Yueming needed to carry out a transformation of the open-air area outside the door.

The stagnant water that had fallen in the open area ran down the drain outside the neighbor’s kitchen.

Therefore, if you want to renovate, you have to connect to the walkway outside the neighbor’s house, the first phase of renovation, downstairs, the neighbor is better to talk.

After going downstairs with consent.

Li Yueming is ready to transform this drainage ditch.

This is not only to provide convenience for Aunt Yan’s family.

It actually makes it convenient for neighbors as well.

At least when both parties pass through this open-air area, they don’t have to worry about the lack of standing water on the roof.

First, Li Yueming filled the ground with some granite.

Immediately afterwards, it was spread out with some white pebbles.

Fill the entire area with pebbles.

Then, granite pedals are designed in the middle of the pebbles that can be stepped on.

In this way, even if it rains, the rain will only drip into the pebbled ground.

The granite part can still be stepped on.

Cobblestones don’t just play an aesthetic role.

It also naturally filters impurities.

In this way, there is no need to worry about the rain hopper set at the outlet being blocked after all this is done.

Li Yueming also designed a glass baffle in front of Aunt Yan’s house.

This baffle can be used to cover the rain.

Convenient for going out or coming home on rainy days.

You won’t get caught in the rain when you take back your umbrella at the door.

Moreover, because Li Yueming changed the exit of the door again.

There is also an area outside the door that can be used for decoration.

Li Yueming chose to plant some mosquito-proof plants inside.

And mixed with some ordinary green plants.

These are all expenses cut out of the remaining 30,000 budgets.

The renovation of the entire doorway area cost about 10,000.

Another 20,000 were used to buy bits and pieces like glass and doors.

In the end, Li Yueming was surprised to find that he actually seemed to have some budget less

The flower beds on the second and first floors, which have not yet purchased sheltering decorations.

The budget of 120,000 in hand has already been spent.