The Engineering Boss

Chapter 270: Tour the scene

Xu Mengyu's grandmother's home was in the countryside of another town. Under the guidance of Old Man Xu, Chen Yang drove for about half an hour and finally arrived at his destination.

   Being able to live to the 90th birthday within a radius of tens of miles is already a long-lived existence, so many people attended this birthday banquet, and this time, Xu Mengyu's grandmother is also preparing to celebrate.

   Old man Xu and his wife had already come here to help two days ago. The reason they went back was because of the two sisters Xu Mengyu, and more importantly, because Chen Yang was coming, so they ran home at noon yesterday.

During the whole birthday banquet, Chen Yang followed Old Man Xu. This was when Old Man Xu said to Chen Yang on the way, because Xu Mengyu and Xu Mengling had to chat with their grandma, so Chen Yang could only Follow old man Xu.

   And this old man Xu was "restless" at all. He introduced all these relatives to Chen Yang, and also introduced Chen Yang out by the way, for fear that others would not know that Chen Yang is his daughter's boyfriend.

   Chen Yang felt very tired following Old Man Xu, even more tired than he was holding a **** to dig into the ground. I hope this time will pass quickly.

   As soon as he finished his lunch at noon, Chen Yang immediately asked Old Man Xu to leave. In fact, not only Chen Yang wanted to leave, but even Xu Mengyu and Xu Mengling wanted to slip away.

   The three of them were very happy after getting permission to leave. They ran back to the county town in a short while in the car. After sending Xu Mengling back to school, Chen Yang and Xu Mengyu hurried back to the city.

   It was only five o'clock in the afternoon when I returned to the city. In the office, Zhou Hongli didn't know where she went. Only the middle-level budget clerk was busy in the office alone.

   "Sister Zhou is resting in the rental room. I will also go back to take a rest and come to work tomorrow."

Xu Mengyu left, and Chen Yang sat on the sofa in his office, holding a tender prepared by a mid-level budgeter and looking at it carefully. When he had just read the commercial part of the tender, a transparent panel suddenly popped up. Up:

   "Your end number xxxx card April 20th 17:37xx bank income 347000.00 yuan, balance 421821.29 yuan"

   finally got some income, but this income is still too small!

   Chen Yang’s current focus is on the road rectification project in Lida County. After all, it was a project of more than 23 million yuan, and 10% of the progress was rewarded with more than two million yuan.

try{mad1(\'gad2\');}catch(ex){}   I wonder if construction on the 25th can officially start?

   It slipped away in the blink of an eye for three days. On April 24, Chen Yang drove to Lida County early in the morning.

Chen Yang brought two middle-level workers and two junior workers this time. Five or six workers have been found on the scene to direct the traffic situation. After all, the early construction will definitely cause traffic congestion, and the site must be arranged. People command.

   At 10:30 in the morning, Chen Yang has arrived at the starting point of road rectification. At this time, the left two-lane road at the entrance of the road has been surrounded by warning tapes, and a notice board has been erected on the left and right of the intersection.

   The junior construction worker is directing a large excavator to break the cement road. It takes more than three hours to break the seven-eight-meter-long cement road according to work at seven.

   "The strength of the concrete poured in the past is a bit high, and the excavator looks a bit difficult to break." Chen Yang came to the junior construction worker and said, "C30 concrete was poured on this road before."

"It should be poured C30 concrete, otherwise the road cannot be so badly crushed. The starting point here may be a special situation, the strength of the concrete is a bit high." The junior constructor explained, "The starting point is more than 20 meters away. After the crushing is completed, the rest will be broken, and the speed should be able to increase a lot."

   It is true that there are basically no big cracks in the 20-odd meters at the beginning, and it can even be reused without being broken. Unfortunately, it is clearly stipulated that all of it must be broken and poured again.

   "Did all the excavators come in today?" Chen Yang asked.

Yesterday, when I called to inquire about the situation on the site, I learned that there is only one excavator delivered to the site, and the excavator that arrived at the site seems to be this excavator. There are also three excavators that were brought to the site today. I know if it came here.

The junior construction worker said: "Two large excavators have been transported in the morning, and one should be delivered by noon. At present, the four-bridge trucks have not notified them to come. Anyway, they are notified very quickly. It will not arrive in half an hour. You can all get to the scene."

"I brought four workers here today. Do you need help from workers here?" Chen Yang asked, "Safety is the most important. When breaking, pay attention to passing vehicles, especially pedestrians. I am worried that the broken stones will fly. The Bank of China caused some unnecessary troubles."

try{mad1(\'gad2\');}catch(ex){}   "I will pay attention to the boss. Then leave a worker for me and let him assist."

   "Okay. By the way, my car is parked here. You can watch it for me, but I dare not drive in!"

   Chen Yang took the remaining three workers and walked in ~www.wuxiaspot.com~ After a while, Chen Yang saw a pickup truck coming to pick them up.

   This is a phone call from Chen Yang to the junior manager when he is parking. If you walk in such a long distance, you don't know how long it will take, so you still inform them to use a pickup truck to pull yourself and the others.

   Chen Yang got on the co-pilot and asked the junior manager: "Are the two excavators that arrived at the scene this morning moving?"

   "One of the excavators hasn't moved yet. He said it would only move in the afternoon." The junior manager said, "The other one is leveling our stacking site and mixing station site. It will take about a day or two here."

"The small mixer can probably be transported to the site for installation the day after tomorrow, so you should hurry up and level out the site. If one excavator is not enough, use two excavators. Anyway, the small mixer must be installed immediately when it is shipped to the site. The installers can’t wait for us that long."

   Soon the junior administrator took Chen Yang to a large flat area on the side of the road. At this moment, a large excavator was leveling, and Ding Zhanshun and the junior material staff were directing on the spot.

   "Is this space enough?"

   This vacant lot has obviously been abandoned for a long time and no crops have been planted. If crops are being planted, the owner would definitely not agree to piling up materials on it.

Excluding the space occupied by the installation of small mixers, the remaining space can stack up to five or six hundred cubic meters of materials. It stands to reason that the continuous supply of materials on the day of the concrete should not be a big problem. The key is in case the materials cannot be pulled. The materials piled up on this site will definitely not last long.

   "How is the problem of sand and gravel materials implemented?"