Chapter 96 Refuse to accept such substandard soil sources

Project material procurement Wang Ming continued: 7. For the payment application procedures for material procurement suppliers, the material procurement person in charge of the project department will arrange for the material procurement personnel to prepare and initiate the application. The business person in charge of the project department needs to process the application. Review.

8. The settlement of material procurement suppliers shall be declared by the supplier in accordance with the company's prescribed form. The material procurement personnel of the project department will conduct the first round of review, and the next step will be reviewed by the commercial person in charge of the project department.

Mr. Zhou, I can think of material procurement work that needs to be reviewed with the commercial person in charge of the project department, and that’s basically it.

What is very embarrassing is that according to the company's regulations, this content is indeed similar to the purchase of seedlings. It's just that the approval of seedling purchase is through the seedling system, and the approval of material purchase is through the material system.

Zhou Wencheng replied easily: You are right that the material procurement is similar to the seedling procurement. This is the company's regulation and has nothing to do with you. You only need to explain the company's requirements clearly to the new commercial director of the project department. It would be great if everyone’s work can proceed smoothly.”

Wang Ming, Material Procurement Department of the Project Department, replied: Thank you, Mr. Zhou, for your understanding.

Zhou Wencheng replied: Put your heart in your stomach. Everyone understands. Now, I would like to ask measurement engineer Lin Jun to talk about the work related to the commercial director of the project department.

Measurement engineer Lin Jun sat up straight, leaned forward and said: My measurement work is relatively simple. It is mainly divided into upper and lower. In principle, there will be a certain difference in the upper and lower data. This difference is The amount is generally negotiated between the measurement engineer and the business person in charge of the project department. After the negotiation and confirmation of the data, the measurement engineer will be responsible for preparing relevant documents, reviewing and improving the above drawings, etc. The measurement engineer will provide written information for the following measurement data, which requires The commercial person in charge of the project department will conduct the review.

Mr. Zhou, these are the main tasks related to the measurement engineer and the business manager of the project department.

Zhou Wencheng replied: Well, it sounds simple to you. Has there been any visa negotiation work for the earthmoving team recently?

Surveying engineer Lin Jun replied awkwardly: The earthmoving team still has some troubles.

Zhou Wencheng arranged: Let's talk about the troubles in detail and see how they can be solved in the future.

Surveying engineer Lin Jun replied: The first trouble is that the earthmoving team said that the price of planting soil has increased from 15 yuan per cubic meter to 20 yuan per cubic meter, and asked us to adjust his contract unit price.

Zhou Wencheng asked: Mr. Zhang, the cost of his earthwork has indeed increased a bit. How can his contract unit price be adjusted?

Zhang Yunqing replied calmly: Mr. Zhou, for this matter we need to understand clearly how much his contract unit price is per cubic meter, what is the work content included in the contract unit price, and whether the contract unit price is a fixed comprehensive unit price. If it is not a comprehensive unit price, , you need to check the principles for adjusting the unit price of the contract. Therefore, I need to study this contract clearly after the meeting, so that I can know how to deal with it.

Zhou Wencheng continued: Okay, Mr. Zhang, please familiarize yourself with this contract as soon as possible and come up with a solution as soon as possible. Mr. Lin, are there any other problems with the earthmoving team?

Surveying engineer Lin Jun replied: The earthwork team also raised the issue of earthwork measurement. They believe that it should be calculated based on the truck volume, not the on-site measurement data. They said that the cubic volume they calculated each time was different from what we measured. Square data,

The differences are quite big, and the loss of profits is relatively large. I hope we can solve it as soon as possible, otherwise they may stop moving earth.

Zhou Wencheng replied: Then this is a more serious matter. Now our entire project is demanding work. If the earthwork is not backfilled, the entire greening project will not be carried out, and it will also affect other gardening projects. construction. Otherwise, if the garden construction is completed first and then the earthwork is carried out, then large machinery will not be able to go to the base of the garden construction, and the additional cost incurred will be unacceptable to us. This matter must be processed expeditiously. You will see it later Take the initiative to find Mr. Zhang and explain clearly the cause and effect, and be sure to find a practical and reliable solution.

Measurement engineer Lin Jun replied: Okay. I will have a good communication with Mr. Zhang after the meeting and find a specific solution.

Zhou Wencheng asked again: Does the earthwork team have anything else to do?

Surveying engineer Lin Jun replied: Other matters are minor and the amounts involved are also small. They can basically be solved through communication with the earthmoving team.

Zhou Wencheng said: That's good. You have to use your subjective initiative to communicate fully and effectively with the earthmoving team. Without increasing costs, try to solve the problems related to the earthmoving team as quickly as possible and ensure that The progress of earthworks can be carried out according to the construction organization plan.”

Measurement engineer Lin Jun replied: Okay, I will definitely continue to work hard.

Zhou Wencheng arranged again: We've finished talking about the earthwork. Next, let's ask the greening engineer Cui Yong to talk about it.

Greening engineer Cui Yong said: Mr. Zhou, in the greening department, we are now one unit for the supply of seedlings, and the same unit for the planting and maintenance of seedlings. The mortality rate of the seedlings that have been planted now is relatively high, and individual seedling species have Reaching 50% of deaths. The economic losses caused to the company are relatively large.

Zhou Wencheng said: Please briefly explain what this problem is.

Greening engineer Cui Yong replied: Okay. Let's take the coconut tree planting with a mortality rate of 50% as an example. There are many problems in the seedlings delivered to the site by the seedling supplier, such as: the soil ball is small, the soil ball is small, and the soil ball is too small. They fell apart, lacked protection during transportation, and caused damage to the main pole of the seedlings, etc.”

Zhou Wencheng arranged: This is a problem with the quality of the supply. Are there others?

Greening engineer Cui Yong replied: There is also a problem with the quality of the soil. The so-called planting soil backfilled in many places is not planting soil at all. There are a lot of bricks, tiles, and concrete blocks in it. These planting soils clearly exist. The pH value is on the high side. And these normal ordinary plants need planting soil with a lower pH value to survive. If the pH value of the soil is wrong, it is equivalent to the plant having been drinking poison from the soil since it was planted. , or the seedlings will die soon.

Zhou Wencheng frowned and asked, This matter is so serious, is there any solution?

The greening engineer replied: The best way is to reject this kind of unqualified soil. What has happened has already happened, and the earthwork unit has been ordered to transport it out at its own expense. If the quality of the earthwork has caused the death of seedlings, the earthwork provider has been required to be punished. Sexual Double Damage Claim.”